文章摘要
李 琦,姚艳飞.崇左XDL4 500 t/d生产线烧成系统热工分析[J].水泥工程,2018,31(4):26-27
崇左XDL4 500 t/d生产线烧成系统热工分析
Thermal analysis of burning system of Chongzuo XDL4 500 t/d clinker production line
  
DOI:
中文关键词: XDL工艺  热工平衡  高产低耗
英文关键词: XDL calcining process  thermal balance  high yield & low consumption
基金项目:
作者单位
李 琦 西安建筑科技大学材料与矿资学院粉体工程研究所 
姚艳飞 西安建筑科技大学材料与矿资学院粉体工程研究所 
摘要点击次数: 1307
全文下载次数: 1
中文摘要:
      对崇左XDL4 500 t/d熟料生产线进行热工标定,其运行产量达到6 351 t/d,熟料综合煤耗为96.53 kg/t、可比熟料综合煤耗为89.03 kg/t。同时C1出口含尘浓度29.20 g/m3,计算得分离效率99%;出篦冷机熟料温度为68.7 ℃,烧成系统、篦冷机系统各项参数均处于领先水平。
英文摘要:
      A thermal calibration of Chongzuo XDL4 500 t/d clinker production line was carried out in 2015, The rating data showed that its yield was 6 351 t/d, and the comprehensive coal consumption of clinker was 96.53 kg/t(the comprehensive coal consumption of comparable clinker was 89.03 kg/t), both production and heat consumption reached the advanced level. And particle concentration of C1 outlet was 29.20 g/m3, calculated separation efficiency of preheating system was 99%; meanwhile, the clinker temperature of the grate cooler was 68.7 ℃, which showed the operations of firing system and grate cooler system are in good condition.
查看全文   查看/发表评论  下载PDF阅读器